Representative execution record

Corporate Atrium — Kinetic Textile Installation

ClientConfidential
CategoryInstallation
Year2025
LocationCentury City, California

Overview

Permanent installation in a 60-foot commercial atrium. Kinetic fabric panels on motorized track systems programmed to reconfigure throughout the day — compressing and expanding in response to occupancy patterns and natural light cycles. Acoustic engineering integration, seismic-rated rigging, and a material palette designed for 10-year UV exposure with scheduled replacement intervals.

Mandate

Design a permanent textile installation that transforms a static corporate atrium into a living environment. The installation must respond to the building's daily rhythm — opening with morning light, reconfiguring for midday foot traffic, and closing to an intimate configuration for evening events.

Execution Scope

  • Installation design — Vectorworks model with kinetic sequence programming and structural engineering
  • Motorized track system design — silent operation rated for 10-year continuous daily cycling
  • Fabric panel fabrication — UV-stable textiles with documented 10-year color retention
  • Seismic rigging — California seismic zone compliance for permanent suspended installation in occupied building
  • Acoustic integration — fabric panels contributing to atrium acoustic management strategy
  • Building management system integration — kinetic sequences triggered by occupancy sensors and daylight levels
  • Installation during building operational hours with occupied-floor safety protocols
  • Full Vectorworks as-built model and maintenance documentation delivered to building engineering

Constraints

  • Permanent installation in occupied commercial building — all work during active business hours with safety protocols
  • Motorized systems requiring silent operation — atrium serves as main lobby and tenant reception area
  • 10-year material lifecycle requiring UV-stable fabrics with documented color retention and replacement schedule
  • Seismic engineering for permanent suspended installation — higher standard than temporary event rigging
  • Building management system integration requiring protocol compatibility with existing Siemens infrastructure
  • Acoustic contribution must be verified — installation cannot degrade existing atrium acoustic performance

S.I.C. Notes

Systems

Rigging infrastructure installed during weekend shutdown periods. Track and motor systems during second phase. Fabric panels hung and programmed during third phase. Each phase independently commissioned.

Intelligence

Atrium acoustic profile measured pre-installation as baseline. UV exposure mapped across all panel positions using annual solar angle data. Existing BMS protocol documented for integration specification.

Control

Motor systems tested through 1,000 cycles before fabric hanging. Acoustic performance measured post-installation and compared to baseline. Kinetic sequences verified across full daily cycle before public activation.

Operational Metrics

60ft
Atrium height
10yr
Designed material lifecycle
3
Daily kinetic configurations
0
BMS integration conflicts

Outcomes

  • Installation activated on schedule — kinetic sequences responding to occupancy and daylight as designed
  • Acoustic measurements confirmed 4 dB improvement in atrium speech intelligibility with panels deployed
  • Building management team operating kinetic system independently through existing BMS interface
  • Installation featured in commercial architecture publication as example of textile integration in corporate environments